MARPOL

Topic 2 of 8

Back to MARPOL
Tools

MARPOL Annex I — Prevention of Pollution by Oil

Learn MARPOL Annex I: IOPP certificate, oil filtering equipment 15 ppm, standard discharge connection, oil discharge criteria, Oil Record Book Part 1 & 2, SOPEP and special areas.

Published by ChartandKeel Updated

1. Application, IOPP Certificate & Key Regulations

MARPOL Annex I: Regulations for the Prevention of Pollution by Oil applies to all ships. It sets requirements for machinery spaces and tanker cargo areas:

  • Regulatory Structure: 7 Ch / 39 Regs
  • IOPP Certificate Validity: 5 Years
  • Machinery Threshold (Tanker ≥ 150 GT): ≥ 400 GT

Chapter 3: Machinery Space Regulations

  • Reg 12: Oil residue (sludge) tanks
  • Reg 13: Standard discharge connection
  • Reg 14: Oil filtering equipment (15 ppm OWS)
  • Reg 15: Control of operational bilge discharge
  • Reg 16: Segregation of oil/ballast and forepeak oil carriage ban
  • Reg 17: Oil Record Book Part 1.

Chapter 4: Tanker Cargo Area Regulations

  • Reg 18: Segregated Ballast Tanks (SBT) protective location
  • Reg 29: Cargo slop tank arrangements
  • Reg 31: Oil Discharge Monitoring & Control System (ODMCS)
  • Reg 34: Tanker cargo discharge criteria
  • Reg 35: Crude Oil Washing (COW)
  • Reg 36: Oil Record Book Part 2.

Chapter 5: Oil Pollution Incident Response

Reg 37: Shipboard Oil Pollution Emergency Plan (SOPEP) mandatory on every oil tanker ≥ 150 GT and every other ship ≥ 400 GT, approved by the Administration with reporting and coordination protocols.

Statutory IOPP Survey Cadence

  • Initial: Before entering service
  • Annual: Within ±3 months of anniversary
  • Intermediate: Within ±3 months of 2nd or 3rd anniversary (extended checks on OWS, ODMCS, COW)
  • Renewal: Every 5 years max.
Figure 1: Tanker machinery and cargo oil systemsPhysical longitudinal tanker cutaway with aft engine, bilge and sludge tanks, oily-water separator and monitor, separate shore sludge flange, forward cargo tanks and crude oil washing nozzles, slop tank, cargo pump and ODMCS, segregated double-bottom ballast and an oil-free forepeak. Separate illustrated books identify ORB Parts I and II.Annex I · two separate oil-control systemsLongitudinal tanker cutaway · aft machinery / forward cargoSludgeBilgeOWSShore reception15 ppm monitor / stopSlopCargo oil tanksCOW nozzles · Reg 35ODMCSCargo discharge monitoringSegregated ballast (SBT)ForepeakNO OILCargo route · Reg 29 / 31 / 34ORB Part I · machineryReg 12: sludge; 13: flange Reg 14: filtering equipment Reg 17: machinery recordsORB Part II · cargo / ballastReg 18: SBT / 29: slop tanks Reg 31: ODMCS / 35: COW Reg 36: cargo / ballast recordsNo cargo residues through the machinery OWS · SOPEP: Reg 37
Figure 1: MARPOL Annex I shipboard internal architecture and regulatory layout. The vessel is divided into machinery spaces (Chapter 3: Reg 12 sludge tanks, Reg 13 standard connection, Reg 14 15 ppm OWS, Reg 16 forepeak ban, Reg 17 ORB Part 1) and tanker cargo blocks (Chapter 4: Reg 18 SBT, Reg 29 slop tanks, Reg 31 ODMCS, Reg 35 COW, Reg 36 ORB Part 2), backed by Chapter 5 SOPEP oil spill emergency response.

2. Oil Filtering Equipment & Standard Discharge Connection

Two essential technical installations under Regulations 13 and 14 ensure oily residues are either cleaned to legal limits or transferred to shore reception facilities:

1. Oil Filtering Equipment (Regulation 14)

Any vessel of 400 GT and above must be equipped with approved oily water separating / filtering equipment. The unit must feature an audible/visual bilge alarm and an automatic fail-safe stop valve that instantly halts sea discharge if the effluent exceeds 15 parts per million (ppm).

2. Fail-Safe 3-Way Diverter Valve

Upon detection of >15 ppm oil content, loss of electrical power, or sample water failure, the spring-loaded pneumatic diverter valve automatically trips closed to overboard and directs the oily stream back to the bilge holding tank.

3. Standard Discharge Connection (Regulation 13)

To enable universal coupling with port reception facilities worldwide, the sludge and bilge manifold discharge pipelines must be fitted with an international standard flange of uniform dimensions, suitable for up to 125 mm inner pipe diameter at 600 kPa (6 bar).

4. Oil-Proof Gasket & Slotted Bolt Holes

The flange has six open slots extending to the outer periphery to facilitate rapid alignment with shore hoses, clamped with six 20 mm bolts and sealed with an oil-proof aramid/nitrile gasket.

Standard Discharge Flange Statutory Dimensions (SOLAS / MARPOL Reg 13):

Feature Statutory Dimension Surveyor Verification Note
Outside Diameter 215 mm Total flange circular outer boundary
Inner Diameter Equal to pipe outside diameter Accepts pipes up to 125 mm bore maximum
Bolt Circle Diameter (PCD) 183 mm Pitch circle for 6 bolt slots
Flange Slots 6 slots of 22 mm diameter Slotted through to flange outer edge for quick fit
Flange Thickness 20 mm Machined flat face steel plate
Bolts & Nuts 6 bolts, each 20 mm diameter Steel fasteners of suitable length with flat washers
Maximum Working Pressure 600 kPa (6 bar / 6 kg/cm²) Fitted with oil-proof gasket
Figure 2: Standard bilge and sludge discharge flangeDimensioned flange plan with six open outer-edge slots, unspecified pipe bore and assembled flat-face gasket section. Outside diameter 215 millimetres, bolt circle 183 millimetres, slot width 22 millimetres, flange thickness 20 millimetres and six 20 millimetre bolts.STANDARD DISCHARGE CONNECTIONMachinery bilge / sludge → reception facilityPLANASSEMBLED SECTIONPCD Ø183 mmØ215 mm6 × Ø22 mm openings at 60° 22 mm slots open to OUTER edgeBore to suit pipe OD No fixed bore dimension6 × Ø20 mm bolts with nuts; length to suitOil-proof gasket20 mmFlat-face contactSteel or equivalent flange Oil-proof gasket + mating flat faces Service pressure: 600 kPa
Figure 2: MARPOL Regulation 13 Standard Discharge Connection mechanical engineering drawing. The universal flange features an outside diameter of 215 mm, bolt circle diameter (PCD) of 183 mm, flange thickness of 20 mm, and six 22 mm radial slots extending to the periphery, fastened by six 20 mm steel bolts with an oil-proof gasket rated for 600 kPa (6 bar).

OWS Regulation 14: 15 ppm filtering equipment

MARPOL Annex I Regulation 14 and IMO Resolution MEPC.107(49) set the type-approval and operational framework for machinery-space oil-filtering equipment. The ship must use equipment appropriate to its certification and approved arrangement; check the IOPP Certificate supplement and the maker's manuals for the installed plant and its limits.

What the OWS must do

  • Separate and filter the oily mixture through the approved stages at the rated conditions. A fine stable emulsion, cleaning chemicals, detergents, excess flow or damaged elements can make compliant separation impossible.
  • Measure the discharge stream with the approved 15 ppm bilge alarm/oil-content monitor. The reading is taken from the equipment's representative sample arrangement; never dilute a sample or alter the sample path to mask oil content.
  • Prevent an unlawful discharge: the associated automatic stopping/diverting arrangement must stop or return the flow when the oil content exceeds the permitted level. Alarm, automatic stop and any required recorder must remain available and correctly configured during operation.
  • Operate only within approval: use the ship's approved piping, flow rate, calibration/test procedure and maintenance schedule. Confirm type-approval plate, certificate and local operating restrictions.

The statutory 15 ppm equipment limit does not by itself authorize an overboard discharge. The separate Annex I discharge conditions (en route, correct source, approved equipment in operation and no dilution) must also be satisfied. For legal limits see Annex I discharge criteria; for the fail-safe valve response see automatic stopping and diversion.

Reference: IMO — Machinery Space Bilges of Ships (MEPC.107(49)).

OWS automatic stopping and fail-safe diversion

The automatic stopping arrangement protects the sea connection when the monitor detects excessive oil content. The valve arrangement varies by approved maker and ship piping: it may divert the effluent to a bilge/holding tank, stop the pump, close the overboard path, or combine these actions. Follow the actual P&ID and approved manual rather than assuming every installation has the same valve logic.

  1. Normal route: the sample monitor reads the treated discharge. Only when the approved system is healthy and the oil-content condition permits discharge can the approved arrangement keep the sea route available, subject to all MARPOL discharge criteria.
  2. High reading: at or above the approved alarm trip setting (15 ppm maximum limit for the relevant equipment), the alarm operates and the automatic stopping device prevents further overboard flow by diverting or stopping it.
  3. Fault condition: loss of monitor power, sample flow, invalid signal or a detected fault must be handled according to the equipment's approved fail-safe design and maker's instructions; the operator must not bypass the monitor or hold the sea valve open to continue discharge.
  4. After a trip: verify the alarm, check the receiving bilge/holding capacity, investigate emulsions, flow rate, filter condition and sample-water faults, and confirm the correct valve position. Resume only after the cause is corrected and the approved test shows the protective function is available.

During survey, the key points are the approved monitor and alarm, automatic stopping function, sample line, overboard/diverting valve indication, test records and consistency with the ship's operating procedure. Type-approved arrangements and relay delays differ; consult the installed manual for timing and terminal-by-terminal logic.

Reference: IMO MEPC.107(49) — Guidelines and Specifications for Pollution Prevention Equipment for Machinery Space Bilges.

3. Control of Discharge of Oil: Criteria

Surveyors rigorously test the legal criteria governing oil discharges, distinguishing sharply between machinery-space bilges and tanker cargo spaces:

1. Machinery-Space Bilges (All Ships ≥ 400 GT — Regulation 15):

1. En Route

The ship must be proceeding en route under its own propulsion (never stationary, at anchor, or drifting in port).

2. Approved 15 ppm OWS

The oily mixture must be continuously processed through type-approved oil filtering equipment conforming to IMO Resolution MEPC.107(49).

3. No Dilution ≤ 15 ppm

The oil content of the effluent without artificial dilution must not exceed 15 parts per million, monitored by an active bilge alarm.

4. Origin & Cargo Residue Exclusion

The oily mixture must not originate from cargo pump-room bilges on oil tankers, and must not be mixed with oil cargo residues.

OWS fresh-water flushing, interlocks and anti-tampering record

Cleaning or testing the OWS with clean water is a controlled maintenance operation, not an opportunity to send clean water overboard through a temporarily defeated monitor. The ship's approved OWS arrangement, maker's manual and Safety Management System (SMS) define the exact valve line-up and test sequence. There is no universal MARPOL-mandated fresh-water flush sequence or single required interlock design.

  1. Notify and prepare: follow the planned maintenance / Chief Engineer authorization process; notify the bridge when required by the vessel procedure and confirm the discharge path and receiving tank.
  2. Secure the overboard path: positively isolate and secure the overboard valve in accordance with the vessel's controlled procedure. Route test or flush water to the approved closed return or holding path. Keep the 15 ppm monitor, alarm and automatic stopping/diverting function in service; never bypass, spoof or defeat them to obtain a discharge.
  3. Flush only as the maker permits: use the specified clean-water connection and sequence. Prevent cross-connection to the sea line, avoid exceeding equipment limits and verify where every flush volume goes. Where fitted, prove the interlock, valve position feedback and alarm response using the maker-approved test method.
  4. Restore and independently check: return all valves and controls to the approved operating configuration, confirm the automatic diversion/stop function is available, inspect for leaks, re-secure the overboard isolation and return any controlled keys to their designated custodian.
  5. Make a traceable record: record the work/test time, location or vessel position as required, responsible personnel, valve/isolation status, flush destination and quantity where known, OCM/alarm/interlock test result, defects and return-to-service confirmation. Make any statutory ORB entry required for the operation, and ensure it agrees with the work log and equipment history.

MEPC.107(49) requires approved bilge water filtering equipment to provide the applicable 15 ppm alarm and automatic stopping arrangement. That equipment requirement is distinct from a vessel's additional key control, cleaning interlock, and anti-tampering log. If an alarm or automatic stopping device is defective, stop overboard discharge and follow the ship's failure procedure.

Regulatory reference: IMO — Machinery Space Bilges of Ships (MEPC.107(49)). Always use the installed system's approved manual and shipboard SMS for actual maintenance.

2. Tanker Cargo Operations (Regulation 34):

Outside Special Areas

  • Vessel proceeding en route
  • Distance > 50 nautical miles from nearest land
  • Instantaneous discharge rate ≤ 30 litres per nautical mile
  • Total quantity discharged ≤ 1/30,000 of total cargo for new tankers (1/15,000 for existing tankers)
  • Operational ODMCS and approved slop tank arrangement.

Inside Special Areas & Antarctic

Inside any designated Special Area: Any discharge of tanker cargo oil residue is STRICTLY PROHIBITED — all slops and washings must be retained on board for discharge to shore reception facilities. In the Antarctic area: ALL discharges whatsoever are prohibited.

Two-stage oily water separator Bilge tank feeds a low-shear pump, gravity coalescer and polishing filter. An effluent sample feeds the oil content monitor, which signals a three-way valve. The valve selects overboard discharge or return to the holding tank. Separated oil goes to an oil collection tank. OIL / SLUDGECollection tankOil drainBILGEHOLDING TANKOily waterFeed pumpLow shear1GRAVITY STAGECoalescing plates2POLISHINGFilter cartridgesOIL CONTENT MONITOR15 ppm bilge alarmContinuous effluent sampleSampleTrip signal3-way diverterShipside valveOVERBOARDOnly with dischargeconditions satisfiedRETURN TO HOLDING TANKAlarm above 15 ppm or loss of power → divert to holding tank; stop overboard discharge.Bilge feedTreated waterOil / sampleControl signalRecirculation
Figure 3: Two-stage oily water separator — Bilge water flows through gravity separation and a polishing filter. The oil content monitor samples the outlet and controls the diverter: alarm or power loss returns the flow to the holding tank.

4. Oil Record Book, SOPEP & Special Areas

MARPOL Annex I demands meticulous operational accountability through the Oil Record Book, emergency preparedness via SOPEP, and zero-discharge compliance in designated Special Areas:

Part I (machinery operations) is required for oil tankers ≥150 GT and other ships ≥400 GT. Part II (cargo operations) is required for oil tankers ≥150 GT.

Oil Record Book Part 1 — Mandatory Letter Codes (Surveyor Recital):

Code A & B: Fuel Tanks

  • Code A: Ballasting or cleaning of oil fuel tanks
  • Code B: Discharge of dirty ballast or cleaning water from oil fuel tanks.

Code C: Sludge & Residues

Collection & disposal of oil residues (sludge): record the retained quantity at the required interval (at voyage end, but not more frequently than weekly; weekly on short voyages) and record each disposal/transfer operation using the applicable Code C item.

Code D & E: Bilge Operations

  • Code D: Non-automatic discharge overboard or disposal of bilge water
  • Code E: Automatic discharge overboard via 15 ppm OWS (stop/start times and vessel positions).

Code F, G, H & I: Equipment, events and remarks

  • Code F: oil-filtering equipment condition/failure
  • Code G: accidental or exceptional discharge
  • Code H: fuel or bulk lubricating-oil bunkering
  • Code I: additional operational procedures and general remarks.

Master Signature Rule

Each operational entry must be signed and dated by the officer in charge upon completion. Each completed page must be signed by the Master. The book must be retained on board for 3 years after the last entry.

Common ORB errors and Port State Control cross-checks

Port State Control can compare the Oil Record Book with the ship's actual tanks, OWS/15 ppm monitor records, alarm history, engine-room logs, sounding records and receipts for shore disposal. A mismatch can lead to questions, inspection findings or further investigation; the outcome depends on the evidence and applicable law.

  • Wrong operation code or item: distinguish transfers between bilge/holding tanks, sludge operations, non-automatic disposal, automatic OWS discharge and equipment failure. Confirm the current flag-approved ORB code list.
  • Incomplete chronology: enter applicable operations without delay; make start/stop times, positions, quantities and tank identities consistent with the actual operation and equipment record. Do not reconstruct a guessed entry later.
  • Missing sign-off or page countersignature: the officer in charge signs the entry; the Master signs completed pages, following the applicable ORB rules and flag-State format.
  • Unclear correction or unexplained gap: preserve the original entry and use the correction method required by the Administration; never erase, overwrite or obscure a record. Explain a genuine interruption or defect through the proper entry and supporting record.
  • Retention and evidence: keep the required ORB onboard for at least three years after the last entry, and retain supporting records as required by the SMS, flag and company procedures.

Regulatory basis: MARPOL Annex I Regulation 17 for Oil Record Book requirements. Use the current Administration-approved book and instructions if formats or amendments differ.

SOPEP (Regulation 37) & Oil Spill Response Equipment Readiness:

MARPOL Annex I Regulation 37 requires every oil tanker of 150 GT and above and every ship other than an oil tanker of 400 GT and above to carry an Administration-approved Shipboard Oil Pollution Emergency Plan (SOPEP). The plan must be written in the working language of the Master and officers and updated whenever contact lists change.

Four Mandatory Core Sections of SOPEP

  • 1. Coastal State Reporting: Immediate reporting protocol for actual or probable oil discharge to nearest Coastal State radio station / MRCC using IMO standard format.
  • 2. Contact Directory: Updated 24/7 contacts for Flag Administration, coastal agencies, managing company / DPA, P&I Club correspondent, and local spill contractors.
  • 3. Shipboard Mitigation Actions: Operational steps to stop/minimize outflow: emergency shutdown, scupper sealing, list/trim ballast adjustments, internal fuel transfer.
  • 4. Port & National Coordination: Clear lines of authority coordinating with port authorities, clean-up contractors, and handling public/media relations (Master/Company only).

Dedicated SOPEP Locker Equipment Inventory

  • Containment & Recovery Equipment: Hydrophobic absorbent pads and rolls (absorbs oil, repels water), absorbent containment booms, loose sorbent granules / sawdust.
  • Pumping & Transfer: Air-operated portable diaphragm pump (Wilden pump) with anti-static earth bonding wire, suction/discharge hoses.
  • Tools & Storage: Non-sparking bronze / plastic shovels, scoops, heavy-duty rubber buckets, mechanical rubber expansion scupper plugs, 200 L steel recovery drums labeled "OILY WASTE".
  • PPE: Chemical suits, nitrile gloves, safety goggles, and organic vapor respirators.

Immediate Operational Steps in Case of Shipboard Oil Spill:

  1. Stop Oil Transfer Immediately: Sound the emergency alarm, hit the emergency stop button on fuel transfer pumps / bunkering manifold, and close all manifold and tank valves.
  2. Notify Bridge & Chief Engineer: Report location, source, and estimated magnitude of spill.
  3. Prevent Overboard Discharge: Verify that all deck scuppers are sealed. If oil threatens to overtop fish plates or coamings, deploy sorbent booms and pads immediately to contain oil on deck.
  4. Rig SOPEP Wilden Pump: Connect the air-operated diaphragm pump to deck service air and bond the static ground wire to the ship's hull. Pump contained oil from savealls and drip trays back into an overflow or designated bunker tank.
  5. Mitigate Outflow (Damage/Grounding): If hull is ruptured, transfer oil internally from the damaged tank to empty or slack double bottom / wing tanks. Counter-ballast to alter list or trim and bring the damaged fracture above the waterline.
  6. Statutory Notifications: Master immediately transmits formal SOPEP initial report to the nearest Coastal State authority, Port Master, DPA, and P&I representative.

The 10 Special Areas Under MARPOL Annex I:

European & Mediterranean

  • 1. Mediterranean Sea
  • 2. Baltic Sea
  • 3. Black Sea
  • 4. North West European Waters (including North Sea, English Channel, Irish Sea, Celtic Sea).

Middle East, Africa & Polar

  • 5. Red Sea
  • 6. Gulfs Area
  • 7. Gulf of Aden
  • 8. Oman Area of the Arabian Sea
  • 9. Southern South African Waters
  • 10. Antarctic Area (all discharges prohibited).
Figure 4: Tanker cargo-slops ODMCSPhysical tanker cargo-slops schematic with centrifugal pump, flowmeter, sample loop and oil-content meter, ship-speed input, computer recorder, actuated overboard stop and return valve. Solid pipes are fluid; purple dashed lines are measurement and control. Discharge criteria include 30 litres per nautical mile boundary and all other conditions.OIL DISCHARGE MONITORING & CONTROLCargo slops system — NOT the 15 ppm machinery-bilge OWSSpeed v (knots) Speed logOil-content meter, C (ppm)ODMCS computer / recorder R = C × Q / (1000 × v) R: L/NM · total oil discharged Time / date + continuous recordCargo slop tankFDischarge pumpFlowmeter Q (m³/h)To seaSample loopOverboard stopReturn to slop tankFluid pipeControl / measurementTRIP: R > 30 L/NM, total cap or fault → sea shut; return openPermit only: >50 NM from land · en route · outside special areasTotal oil cap: applicable 1/15,000 or 1/30,000 of relevant cargo.All criteria together; ODMCS and slop-tank arrangement operating.
Figure 4: Oil Discharge Monitoring and Control System (ODMCS) functional P&ID for oil tanker cargo operations. The computing unit continuously integrates effluent oil concentration (ppm), overboard flow rate (m³/h), and GPS speed log (knots). If the instantaneous discharge rate exceeds 30 litres per nautical mile or cumulative discharge exceeds 1/30,000 of cargo, the system immediately shuts the motorized overboard valve and diverts the stream back to the slop tank.

Oil Record Book Part I — Codes A to I

Part I records machinery-space oil operations. Use the code and item number from the current Administration-issued book, enter the required particulars chronologically, sign for the completed operation, and have the Master countersign each completed page. The code describes the operation; it does not make an otherwise prohibited discharge lawful.

CodeOperation to recordTypical example
ABallasting or cleaning of oil-fuel tanksTank cleaning, wash water transfer, fuel-tank ballast
BDischarge of dirty ballast or cleaning water from oil-fuel tanksDischarge through approved equipment or to reception facility
CCollection and disposal of oil residues (sludge)Retained sludge quantity; transfer, incineration, evaporation or shore disposal
DNon-automatic discharge, transfer or other disposal of machinery-space bilge waterBilge wells to an approved bilge holding tank; non-automatic OWS operation
EAutomatic discharge overboard or other disposal of machinery-space bilge waterSystem put into automatic discharge or automatic holding-tank transfer mode
FCondition of oil-filtering equipmentMonitor/alarm/automatic stopping device failure and restoration
GAccidental or other exceptional discharge of oilTime, position, approximate quantity/type and circumstances
HBunkering of fuel oil or bulk lubricating oilPlace/time, grade, quantity and tank identities
IAdditional operational procedures and general remarksOther required operational details not covered by the preceding codes

Code D and E: bilge transfers and automatic operation

For a non-automatic transfer of bilge water from engine-room bilge wells to a tank listed in section 3.3 of the ship's IOPP Certificate supplement, the IMO recording guidance uses Code D:

  1. D 13: quantity transferred, in cubic metres, and the source bilge wells/tank as applicable.
  2. D 14: transfer start and stop time.
  3. D 15.3: receiving tank name/designation and quantity retained in the tank after transfer.

For automatic operation, Code E distinguishes the time/position the system enters automatic overboard mode (E 16), automatic transfer-to-holding-tank mode and tank identity (E 17), return to manual mode (E 18), and method of overboard discharge (E 19). Use Code D rather than E for a manually started tank transfer. Complete any additional entries required by the current approved book and ship's procedures.

Reference: IMO, MEPC.1/Circ.736/Rev.2, Guidance for the Recording of Operations in the Oil Record Book Part I (example 10); see also the Australian Maritime Safety Authority notice on ORB Part I guidance. The flag-approved ORB format and instructions take precedence where revised.

Standards & sources referenced

  • SOLAS: International standards for the safety of life at sea.
  • MARPOL: International rules to prevent pollution from ships.
  • Conventions index