MEP / Marine Electrical — Most Asked Questions
A selection of the heaviest questions asked in the MEP / Marine Electrical paper, grouped by machine. 52 questions across 15 machines, 428 total weight. Tick what you can answer cold.
Crankshaft / Bearing / Cylinder
-
1 Cylinder head pressure testing
High priority -
2 Tappet clearance of ae?
Revise -
3 What are the different methods of taking clearance in main bearing?where exactly we take clearance in telescopic feeler gauge?
Revise -
4 WHAT CHECKS ON PISTON AND LINER
Revise -
5 tappet clearance adjustment
Revise
All 6 questions on Crankshaft / Bearing / Cylinder, with answers and occurrence evidence
Boiler (motor)
-
1 How to blow down the boiler?
Must master -
2 how to increase boiler efficiency
Revise -
3 Boiler blowdown procedure?
Revise
All 3 questions on Boiler (motor), with answers and occurrence evidence
Certificates & Statutory Survey
-
1 atist the steps to be taken to meet this emergency situation. (8) Subsequent inspection and action required to put the engine on normal operation (8
Revise
All 1 questions on Certificates & Statutory Survey, with answers and occurrence evidence
Piping & Hydraulics
-
1 CLOSE STEAM VALVE
Revise -
2 LEAKY SOLENOID VALVE
Revise -
3 WHAT TO DO IF VALVE SEAT DAMAGED?
Revise
All 3 questions on Piping & Hydraulics, with answers and occurrence evidence
Engine Room - General
-
1 what overhauling u have done onboard ??
High priority -
2 gauge glass blowdown
Revise -
3 Since corrosion may happen on the part above the upper bearing
Revise -
4 IHP and BHP?
Revise -
5 What is scavenge efficiency
Revise
All 23 questions on Engine Room - General, with answers and occurrence evidence
Fuel Oil System
-
1 Fuel valve overhaul?
Revise
All 1 questions on Fuel Oil System, with answers and occurrence evidence
Lubrication System
-
1 How to check condition of lube oil
Revise -
2 R. START THE LUBE OIL PUMP & CHECK
Revise
All 2 questions on Lubrication System, with answers and occurrence evidence
Ship Structure - Plating & Seams
-
1 Enumerate at least five common faults in welding and measures to prevent. Substantiate your answer with suitable sketches
Revise -
2 Less welding current
Revise
All 2 questions on Ship Structure - Plating & Seams, with answers and occurrence evidence
Purifier / Clarifier
-
1 Purifier manual desludging procedure?
Revise -
2 purifier starting procedure
Revise
All 2 questions on Purifier / Clarifier, with answers and occurrence evidence
Engine Room Auxiliaries (MEP)
-
1 Air compressor overhauling
Revise
All 1 questions on Engine Room Auxiliaries (MEP), with answers and occurrence evidence
Auxiliary Machinery - ER
-
1 Reduction in vacuum in the suction lines of bilge pump system due to ingress of air, has been experienced JaList the causes leading to this problem
Revise
All 1 questions on Auxiliary Machinery - ER, with answers and occurrence evidence
Gas Cylinder & CO2 Room Safety
-
1 all cylinder liner clearances?how to measure?
Revise -
2 main air bottle taking lot of time to fill up... reasons
Revise
All 2 questions on Gas Cylinder & CO2 Room Safety, with answers and occurrence evidence
Refrigeration Plant
-
1 How to purge air from refrigeration system?
Revise -
2 Sketch and Describe and explain the operation of the domestic refrigeration system of a ship using freon 22 gas as refrigerant
Revise
All 2 questions on Refrigeration Plant, with answers and occurrence evidence
Sounding & Level Measurement
-
1 Piston ring calibration?
Revise -
2 liner calibration in details
Revise
All 2 questions on Sounding & Level Measurement, with answers and occurrence evidence
Boiler (MEP)
-
1 why you need to remove oxygen from boiler feed water and how to remove?
Revise
All 1 questions on Boiler (MEP), with answers and occurrence evidence
Answers live on the per-machine pages.
Source: 123 written papers and surveyor oral banks, 24,613 entries, merged into 17,210 topics. Ticks are stored on this device only.