Ship Structure - Deck & Hull Fittings — Most Asked Questions

9 questions asked about ship structure - deck & hull fittings across the General and Fn 3 papers, heaviest first.

9 questions 0 ticked
  1. 1 Brief about chain locker – location, purpose, pumping arrangement and need, safety precautions to avoid flooding of chain locker

    High priority Theory asked 6 times · across 5 examiner banks General

    Answer

    The chain locker lives forward of the collision bulkhead stowing both cables: spurling pipes in, eductor out, watertight always.

    • Location forward of the collision bulkhead with a centreline division separating port and starboard chains.
    • Hawse pipes guide cables from deck to locker; the thick lower plating and perforated bottom drain mud and water.
    • Pumped by eductor or bilge suction — mud and wash-down water must leave or the locker corrodes and floods.
    • Flooding guards: watertight boundaries, sealed spurling pipes, sounding, and never open the locker at sea without the master.

    Surveyor follow-up: chain locker full of water after heavy weather — eductor, boundaries or spurling pipes, and what do you check first?

    Full theory: Anchor Handling and the Windlass — Duties, Brake and Slipping Clutch
  2. 2 Master's responsibility & authority

    High priority Theory asked 5 times · across 5 examiner banks Fn 3

    Also asked: “Master’s responsibility & authority”

    Answer

    The master has overriding authority for safety: the company backs it, the Code demands it, no commercial order overrules it.

    • The safety system states the master’s overriding authority to stop operations, deviate and call for help.
    • Responsibility covers crew, ship, cargo and environment from berth to berth.
    • Authority includes refusing an unsafe order, putting into refuge and spending for safety without prior approval.
    • Proved by standing orders, log entries and the DPA link — the surveyor reads all three.

    Surveyor follow-up: charterer orders sailing with a known defect — obey, refuse or call, and who backs the call?

    Full theory: SOLAS Chapter V — Safety of Navigation (AIS, LRIT & VDR)
  3. 3 Mast riser regulation

    Revise Theory asked 8 times · across 3 examiner banks Fn 3

    Answer

    Vapour openings stand tall and far from ignition: as high as practicable, never below 2 m over the tank deck and 5 m from intakes.

    • Height buys dispersal — mast risers and vent outlets rise to the practicable maximum above the cargo deck.
    • Minimum 2 m above the tank deck for small-flow thermal-breathing openings.
    • At least 5 m horizontally from air intakes, accommodation openings and deck machinery that could spark — windlass and chain locker count as ignition hazards.
    • Closing appliances, flame screens and high-velocity valves complete the rule the surveyor measures with a tape.

    Surveyor follow-up: vent 1.5 m above deck beside the windlass — height, distance or both, and what moves?

    Full theory: Decks, Openings and Watertight Closing Appliances
  4. 4 In all cases seafarer can file complaint directly to MASTER, SHIP MANAGER/MASTER and COMPETENT AUTHORITY

    Revise Theory asked 4 times · across 4 examiner banks Fn 3

    Answer

    Complaints never dead-end aboard: department head, master, manager and competent authority stand in one open line.

    • Start with the head of department or superior officer with facts and remedy in writing.
    • Rise to the master personally when the department cannot satisfy the seafarer.
    • Beyond the ship lie ship manager, owner and the competent authority of flag and port state.
    • Representation, records and no-victimisation guard every step of the climb.

    Surveyor follow-up: HOD blocks the complaint from reaching the master — compliant or not, and what breaks the block?

    Full theory: STCW: The Convention & Its Eight Chapters
  5. 5 Chain locker location

    Revise Theory asked 3 times · across 3 examiner banks General

    Answer

    Chain lockers live forward of the collision bulkhead: drained wells fed by spurling pipes from the windlass.

    • Forwardmost store below the forecastle with a centreline division separating port and starboard cables.
    • Chains run from gypsy wheels down spurling pipes into the locker, hawse pipes closing the weather deck above.
    • Perforated bottom with drainage clears mud and water so chain never stews in its own wash.
    • Bitter ends secured to structure with releasable slip, covers fitted so nothing falls in during anchoring.

    Surveyor follow-up: locker draining to the forepeak with mud piled to the pipe mouths — drainage, structure or stability issue first?

    Full theory: Ship Types, Hull Form and the Parts of a Ship
  6. 6 Gunwale, bulwark, solid floors, girders

    Revise Theory asked 2 times · across 2 examiner banks Fn 3

    Answer

    Gunwale and bulwark are the top edge and the wall; floors and girders are the transverse strength inside the hull.

    • The gunwale is the upper edge of the side shell at deck level, and on a weather deck it is the main longitudinal strength member.
    • A bulwark is the light vertical extension of the side above the deck, standing up the side to keep water off the deck.
    • Solid floors are the transverse strength members spanning between the side and the centre girder, carrying deck load and limiting panel buckling.
    • Girders are the deeper built-up members of the same strength system, and at the bottom the side girders sit on the double bottom.

    Surveyor follow-up: bulwark plating with a slot at the deck edge — what is that slot for, and what follows from it?

    Full theory: Double Bottom Structure and Bottom Framing
  7. 7 Mast riser and its height

    Revise Theory asked 2 times · across 2 examiner banks Fn 3

  8. 8 What is gunwale

    Revise Theory asked 2 times · across 2 examiner banks Fn 3

    Answer

    The gunwale is the top edge of the side shell: where a bulwark continues upward, the gunwale is the capping where it stops.

    • It is the upper edge of the shell plating, stiffened and running the length of the ship on both sides.
    • Where bulwarks are fitted the gunwale is the capping bar at the top of the bulwark; where not, it is simply the deck edge.
    • Freeing ports are fitted in the bulwark below it, and it carries the top mooring loads and the deck-edge loads.
    • A bulwark keeps the sea off deck; a gunwale is the structural edge it is built on.

    Surveyor follow-up: bulwark fitted with no capping and the deck edge plating fatigued — is that a defect, a design or a repair?

    Full theory: Ship Types, Hull Form and the Parts of a Ship
  9. 9 What is mast riser how does it operate and wt is the hieght in ur ship and why it is at the top

    Revise Theory asked 2 times · across 2 examiner banks Fn 3

    Answer

    A mast riser is the trunk carrying wiring, piping and sometimes exhaust from below deck up to the masthead and aerials.

    • It rises from the deck or a trunk in the superstructure up through the mast, carrying cables, pipes and antenna feeders.
    • It is a tubular trunk with a door at the top for access, and it is where the radar, GPS and radiotelephone aerials are mounted.
    • It is at the top because that is the highest clear position — the aerials need height and an unbroken view for the longest range.
    • Its height is set by the ship’s air draught and by what has to be carried on it; quote your own ship’s figure.

    Surveyor follow-up: aerials down on the monkey island because the riser is short — mast, signal or air draught?

    Full theory: Ship Types, Hull Form and the Parts of a Ship

Source: 123 written papers and surveyor oral banks, 24,613 entries, merged into 17,210 topics. Ticks are stored on this device only.